Installation, For qualified installers only), Clearances - straight installation – Lopi Leyden Pellet Stove User Manual

Page 8: Clearances - corner installation

Advertising
background image

8

Installation

(For Qualified Installers Only)

Travis Industries

4061016

1 0 0 - 0 1 1 8 4

Clearances - Straight Installation

7” Minimum

6” Minimum

3”

Minimum

2”

Minimum

“Tee”

3” Minimum

7” Minimum

Through the Wall Installations

Interior Vertical Vents

Floor Protection

6” Minimum

Clearances - Corner Installation

Through the Wall Vents

6” Minimum

3” Minimum

45° Elbow

45°

3” Minimum

Interior Vertical Vents

3” Minimum

3” Minimum

6” Minimum

2”

Minimum

3”

Minimum

“Tee”

Note:

If interior vertical pellet vent is used, the clearance to the backwall is determined by the
upward-turning elbow or "Tee". It will vary in depth depending on the brand of pellet vent
used (it is approximately 5"). Before placing the heater, connect the elbow or "Tee" and
measure off the 3" clearance.

Advertising