Deck mechanism adjustment, Guide roller height adjustment – LG TL-AT130M User Manual

Page 52

Advertising
background image

DECK MECHANISM ADJUSTMENT

4-15

4.Guide Roller Height Adjustment

Adjustment Procedure

1) Confirm if the tape runs along the tape guide line of the

Lower Drum.

2) If the tape runs the bottom of the guide line, turn the

Guide Roller Height Adjustment Screw to clockwise
direction.

3) If it runs the top, turn to counterclockwise direction.
4) Adjust the height of the Guide Roller to be guided to the

guide line of the Lower Drum from the starting and end-
ing point of the Drum.

Purpose: To regulate the height of the tape so that the bottom of the tape runs along the

tape guide line on the Lower Drum.

Test Equipment/ Fixture

• Post Height Adjusting Driver

Test Conditions (Mechanism Condition)

• Play or Review Mode

Adjustment Point

• Guide Roller Height Adjustment

screws on the Supply and Take-Up
Guide Rollers.

Fig. C-4-1

Upper Flange

Guide Roller
Retaining Screw

Guide Roller Height
Adjustment screw

ADJUSTMENT DIAGRAM

Test Equipment/Fixture

• Oscilloscope
• Alignment Tape
• Post Height Adjusting

Driver

Test Equipment Connection Points

• CH-1:PB RF Envelope
• CH-2:NTSC: SW 30Hz

PAL: SW 25Hz

• Head Switching Output

Point

• RF Envelope Output

Point

Test Conditions VCR(VCP) State

• Play an Alignment Tape

Adjustment Point

• Guide Roller Height

Adjustment Screws

Fig. C-4-2

Fig. C-4-3

P3 POST
ADJUSTMENT

P2 POST
ADJUSTMENT

Turn the Roller Guide Height
Adjustment Screw slightly
to flatten the waveform.

Tracking Control at center

RF ENVELOPE OUTPUT TEST POINT

OSCILLOSCOPE

HEAD SWITCHING OUTPUT TEST
POINT

Turn(Move) the Tracking
Control to both directions

4-1. Preliminary Adjustment

4-2. Precise Adjustment

Adjustment Procedure

1) Play an Alignment Tape after connecting the probe of the

Oscilloscope to the RF Envelope Output Test Point and
Head Switching Output Test Point.

2) Tracking Control(in PB Mode) : Center Position(When

this adjustment is performed after the Drum Assembly
has been replaced, set the Tracking Control so that the
RF Output is Maximum).

3) Height Adjustment Screw : Flatten the RF waveform.

(Fig. C-4-2)

4) Turn(Move) the Tracking Control(in PB Mode) clockwise

and counterclockwise.(Fig. C-4-3)

5) Check that any drop of RF Output is uniform at the start

and end of the waveform.

NOTE

If the adjustment is excessive or insufficient the tape will
jam or fold.

Waveform Diagrams

Connection Diagram

Advertising