Pre-installation considerations, Hardware installation – Linksys SRW224 User Manual

Page 14

Advertising
background image

8

Chapter 3: Connecting the Switch
Pre-Installation Considerations

24-port 10/100 + 2-Port Gigabit Switch with WebView

Pre-Installation Considerations

Fast Ethernet Considerations

If you will be using the Switch for Fast Ethernet (100Mbps) applications, you must observe the following
guidelines:

Full-Duplex Considerations

As previously mentioned, the Switch provides full-duplex support for its RJ-45 ports. Full-duplex operation allows
data to be sent and received simultaneously, doubling a port’s potential data throughput.

If you will be using the Switch in full-duplex mode, the maximum cable length using Category 5 cable is 328 feet
(100 meters).

Positioning the Switch

Before you choose a location for the Switch, observe the following guidelines:

•

Make sure that the switch is accessible and that the cables can be connected easily.

•

Keep cabling away from sources of electrical noise, power lines, and fluorescent lighting fixtures.

•

Position the Switch away from water and moisture sources.

•

To ensure adequate air flow around the Switch, be sure to provide a minimum clearance of two inches (50
mm).

•

Do not stack free-standing Switches more than four units high.

•

Connect Network Devices

Hardware Installation

To connect network devices to the Switch, follow these instructions:

1. Make sure all the devices you will connect to the Switch are powered off.

2. Connect a Category 5 Ethernet network cable to one of the numbered ports on the Switch.

3. Connect the other end to a PC or other network device.

Advertising