# 48283B006

If the system is void of refrigerant, clean the system using
the procedure described below.

1. Use dry nitrogen to pressurize the system and check

for leaks. Repair leaks, if possible.

2. Evacuate the system to remove as much of the

moisture as possible.

3. Use dry nitrogen to break the vacuum.

4. Evacuate the system again.

5. Weigh the appropriate amount of HCFC-22 refrigerant

(listed on unit nameplate) into the system.

6. Monitor the system to determine the amount of

moisture remaining in the oil. Use a test kit to verify
that the moisture content is within the kit’s dry color
range. It may be necessary to replace the filter drier
several times to achieve the required dryness level. If
system dryness is not verified, the compressor
will fail in the future.

The outdoor unit should be charged during warm weather.
However, applications arise in which charging must occur
in the colder months. The method of charging is deter-
mined by the unit’s refrigerant metering device and the
outdoor ambient temperature.

Measure the liquid line temperature and the outdoor
ambient temperature as outlined below:

1. Connect the manifold gauge set to the service valve

ports as follows:

Low pressure gauge to suction line service valve

High pressure gauge to liquid line service valve

2. Close manifold gauge set valves. Connect the center

manifold hose to an upright cylinder of HCFC-22.

3. If room temperature is below 70°F, set the room thermo-

stat to call for heat. This will create the necessary load
for properly charging the system in the cooling cycle.

4. Use a digital thermometer to record the outdoor

ambient temperature.

5. When the heating demand has been satisfied, switch

the thermostat to cooling mode with a set point of
68°F. When pressures have stabilized, use a digital
thermometer to record the liquid and suction line
temperatures.

6. The outdoor temperature will determine which charg-

ing method to use. Proceed with the appropriate
charging method.

START-UP

1. Rotate fan to check for frozen bearings or binding.

2. Inspect all factory and field-installed wiring for loose

connections.

3. After evacuation is complete, open liquid line and

suction line service valves to release refrigerant
charge (contained in outdoor unit) into system.

4. Replace the stem caps and secure finger tight, then

tighten an additional 1/6 of a turn.

5. Check voltage supply at the disconnect switch. The

voltage must be within the range listed on the unit
nameplate. If not, do not start equipment until the
power company has been consulted and the voltage
condition corrected.

6. Set thermostat for cooling demand, turn on power to

indoor blower and close the outdoor unit disconnect
switch to start the unit.

7. Recheck unit voltage with unit running. Power must be

within range shown on unit nameplate.

Refrigerant Charging

Units are factory charged with the amount of HCFC-22
refrigerant indicated on the unit rating plate. This charge is
based on a matching indoor coil and outdoor coil with 15'
line set. For varying lengths of line set, refer to Table 5 for
refrigerant charge adjustment.

If unit is equipped with a crankcase heater, it
should be energized 24 hours before unit
start-up to prevent compressor damage as a
result of slugging.

CAUTION

Refrigerant Charge Adjustment

* If line length is greater than 15 ft., add this amount.

If line length is less than 15 ft., remove this amount.

Table 5

t

e

S

e

n

i

L

d

i

u

q

i

L

r

e

t

e

m

a

i

D

t

s

u

j

d

a

.

t

f

5

r

e

p

.

z

O

*

t

e

s

e

n

i

l

.

t

f

5

1

m

o

r

f

.

n

i

8

/

3

.

t

f

5

r

e

p

.

z

o

3

Advertising