Langley/Empire DV-40E-5 User Manual

Page 12

Advertising
background image

Page 12

19562-1-0606

Figure 11

Condensate Removal (Figures 11 and 12)

The condensate drain kit is used in conjunction with DVE and

DVE-2, intake/exhaust extension kits. The condensate drain kit is

required whenever there is a vertical vent run, in a heated room [10

ft. (3m) or more for DV-40E or 6 ft. (1.8m) or more for DV-20E],

in the intake/exhaust venting.
Whenever a vertical vent run, in a heated room [10 ft. (3m) or more

for DV-40E or 6 ft. (1.8m) or more for DV-20E] and a horizontal

vent run are combined, you must purchase the optional condensate

drain kit, part number DV-1108. If the vertical vent run lengths are

less than those required for the condensate drain kit, you can slope

the horizontal vent run portion, downward 1/4" (6mm) per foot

(.3m) to the outside. However, if local codes prohibit condensate

from draining outside and the appliance produces condensate, the

horizontal portion of the vent run must slope downward, to the

appliance, 1/4" (6mm) per foot (.3m). This will allow any condensate

to flow into the condensate drain kit. Do not use the orange silicone

elbow supplied with unit to catch condensate. You can route the

condensate from the condensate drain kit to an existing drain or

into the condensate drain pan located within the appliance.
Whenever a horizontal vent run is used, where local codes allow,

you can slope the exhaust pipe downward, to the outside, 1/4"

(6mm) per foot (305mm). The downward slope on the exhaust

pipe will allow any condensate to flow out of the exhaust pipe. If

local codes prohibit condensate from draining to the outside and

the appliance produces condensate you must purchase condensate

drain kit, part number DV-1108.

INTAKE

SLOPE THE VENT TERMINAL

HORIZONTAL RUN DOWNWARD

THE OUTSIDE TO DRAIN OUT

ANY CONDENSATE

EXHAUST

VENT TERMINAL

EXHAUST AIR

ELBOW WITH CLAMPS

INTAKE AIR

SUPPORT STAP EVERY

5 FT. (1.5m) MIN.

SHROUD SIDE

EXHAUST AIR

INTAKE AIR

EXTERIOR

W

ALL

COUPLING WITH

HOSE CLAMPS

SLOPE DOWNWARD 1/4" (6mm)

PER FOOT (m) TO DRAIN ANY

CONDENSATE OUTSIDE

FILTER

TEMPERATURE CONTROL DOOR

INTERIOR WALL

Figure 12

Reassembly and Resealing Vent-Air Intake System

When vent-air intake system is removed for servicing the furnace,

the following steps will assure proper reassembly and resealing

of the vent-air intake assembly. Be sure all hose connections and

elbow assemblies are re-secured in place using the hose clamps

removed. Reattach all screws securing mounting flanges and inspect

all connections for a tight fit. Use high temperature silicone caulk

rated at 204°C/400°F to reseal the inlet air vent pipe and exhaust
air vent pipe to the mounting plate.

Advertising
This manual is related to the following products: