Prepare boiler

(continued)

FASTENERS
APPROPRIATE
FOR WALL TYPE
QTY: 4

MOUNTING BRACKET
(FACTORY SUPPLIED)

WALL:
WOOD OR METAL STUDS ON
16" CENTERS -OR-
MASONRY / POURED CONCRETE

Figure 2-4 Mounting the Boiler

VENTURI

GAS VALVE

GROMMET

BRASS ORIFICE

SCREWS

Figure 2-3 Installing Propane Orifice

13. Reattach the Molex plug to the gas valve.

14. Models 55 - 285 only, turn the gas valve power switch to

the “ON” position.

15. Model 399 only, turn on power at the source.

16. After the installation is complete, fill out the gas conversion

label (in the conversion kit bag) and affix it to the unit
under the boiler rating plate inside the unit. Attach the
LP caution label (in the conversion kit bag) to the left side
of the unit in the lower left corner.

17. Replace the front access cover.

2. Mount the wall bracket using the 2 1/4" lag bolts

provided. Make sure the top edge of the bracket is away

from the wall. Ensure the bracket is level when mounted.

Extreme care is needed to ensure the bolts are secured in

the center of the studs.

3. Hang the boiler on the bracket and secure the bottom of

the boiler with two (2) additional lag bolts provided.

Mounting to a metal studded wall:

1. The wall mount bracket is designed for a stud spacing of

16 inches from center. For other stud spacing a solid

mounting surface must be provided by the installer.

ƽ WARNING The boiler is too heavy for a single person

to lift. A minimum of two people is needed
for mounting the boiler onto the bracket.

2. Mount the wall bracket using two (2) field supplied toggle

bolts capable of supporting 100 pounds each. Ensure the

top edge of the bracket is away from the wall. Ensure the

bracket is level when mounted. Extreme care is needed to

ensure the bolts are secured in the center of the studs.

3. Hang the boiler on the bracket and secure the bottom of the

boiler with two (2) field supplied toggle bolts.

ƽ WARNING

Do not mount the boiler to a hollow wall. Be
sure to mount the boiler to the studs only.

Mounting the boiler

See page 9 of this manual for boiler mounting location
instructions.

NOTICE

The Knight Wall Mount boiler is not
intended for floor installation.

Mounting to a wood studded wall:

1. The wall mount bracket is designed for a stud spacing of

16 inches from center. For other stud spacing a solid

mounting surface must be provided by the installer.

ƽ WARNING Do not mount the boiler to a hollow wall.

Be sure to mount the boiler to the studs
only.

Mounting to a concrete wall:

1. Mount the wall bracket using the two (2) wedge anchor

bolts provided with the bracket. To mount the wedge

anchor bolts, drill a 1/4" diameter hole 1 1/8" deep and

insert anchor. Hang the bracket from the anchor and secure

with the two nuts provided. Make sure the top edge of the

bracket is away from the wall. Ensure bracket is level when

mounted. Extreme care is needed to ensure the bolts are

secured in the center of the studs.

Note: If wall thickness does not allow a 1 1/8" deep hole,
field supplied hardware suitable for the application should be
provided.

2. Hang the boiler on the bracket and secure the bottom of the

boiler with two (2) remaining anchors, following the

instructions

above.

ƽ WARNING

The boiler is too heavy for a single person to
lift. A minimum of two people is needed for
mounting the boiler onto the bracket.

ƽ WARNING

After converting to LP, check combustion
per the Start-up procedure in Section 10
of this manual. Failure to check and
verify combustion could result in severe
personal injury, death, or substantial
property damage.

ƽ WARNING The boiler is too heavy for a single person to

lift. A minimum of two people is needed for
mounting the boiler onto the bracket.