Figure 13, Figure 14 – Life Fitness 8225 User Manual

Page 11

Advertising
background image

Route threaded end of the TRICEP CABLE (12) around pulleys in TOP BOOM (2) and PULLEY

BLOCK ASSEMBLY. Route TRICEP CABLE (12) down through hole in TOWER BRACE (7) as shown
in FIGURE 13.

STEP 13:

FIGURE 13

SECURELY assemble one 4-1/2” PULLEY (13) between the plates of the TOP BOOM (2) using one

3/8 X 2-1/4” BOLT (21) and one 3/8” LOCK NUT (27) as shown in FIGURE 14. (NOTE: Make
sure the cable runs in the groove of the PULLEY.)

STEP 14

:

FIGURE 14

11

PULLEY

BLOCK

ASSEMBLY

12

3/8 X 2-1/4” 21

13

12

27

2

2

7

Advertising