Figure 2 – ParaBody 778 User Manual

Page 6

Advertising
background image

6

FIGURE 2

STEP 2:

• Route the 120” CABLE (3) around the pulley in the BOOM PLATES as shown in FIGURE 2. (NOTE: Make sure the cable

runs in the grooves of the pulleys.)

• Assemble one 3-1/2” PULLEY (5) to the PULLEY BRACKET (2) using one 3/8 X 1-3/4” BOLT (9) and one 3/8” LOCK NUT

(8) (Note: Loop the 120” CABLE around the PULLEY prior to assembling the PULLEY BRACKET.)

• Screw the long threaded end of the new WEIGHT STACK CABLE (3) into the end of the WEIGHT PLATE SHAFT. See

FIGURE 2.

• Screw the short threaded end of the WEIGHT STACK CABLE (3) into the end of the PULLEY BRACKET (2) .See FIGURE 2.

8

3

5

2

3/8 X 1-3/4” 9

Advertising