PLUMBING INSTALLATION

Install the flow sensor and the pH sensor using the following steps:

1.

Turn off all power to the system, close all isolation valves and then release any air from the

system by turning the release valve on top of the system filter.

2.

The flow sensor and pH sensor "T's" must be installed after the filter but, before the chemical injector

Install the flow sensor before the pH sensor.

The flow sensor "T" has an arrow on it. The arrow

indicates water flow direction.

3.

Remove the protective cap from the pH sensor. Using the "T" with the sensor adapter, install the sensor

into the adapter. Push the sensor into the adapter until it hits the bottom of the "T"

(see Fig 5). Tighten the sensor adapter (hand tighten only).

4.

Allow for sufficient drying time of the PVC glue (minimum recommendation of 24 hrs).

5.

Close the air release valve on top of the filter. Open any isolation valves and check the system for leaks.

Smart pH

Water Chemistry Controller

IN

TELLIGENC

E

I

N

S

ID

E

ACU-TROL

IN

SID

E

www.acu-trol.com Made in USA 110 VAC, 5A

Disconnect power source before servicing unit

Turn “Set Point” knob to the

far left or right to trigger pH

reading function

(see manual for details)

POWER

HIGH

BALANCED

LOW

CHEMICAL

FEED

pH

pH

pH

Set Point

cu-Trol

PROGRAMMABLE CONTROLLERS

®

Figure 3. Plumbing Installation Diagram

CAUTION

The flow switch and the pH sen-

sor must be installed before the

chemical injectors. Installing the

flow switch and pH sensor after the

chemical injectors will cause the

Smart pH to give false readings.

!

HEATER

CHEMICAL

FEEDER PUMP

SMART pH

FILTER

PUMP

Figure 5. pH Sensor Installation

PVC "T"

pH

Sensor

PUSH SENSOR

INTO "T" UNTIL

IT STOPS

Figure 4. Flow Sensor Installation

FLOW SENSOR "T" MUST BE

INSTALLED IN THIS DIRECTION

WATER

FLOW

Advertising