Premier Mounts Low-Profile Universal Projector Mount PDS-PLUS User Manual

Page 7

Advertising
background image

PDS-PLUS

Installation Instructions

Page - 7 -

Ceiling Installation – Pipe

Unpack the PDS-PLUS Mount and familiarize yourself with the components. Please take time before you install the PDS-PLUS to

determine the location of where the PDS-PLUS will be mounted.

The PDS-PLUS may be attached to 1-1/2” standard threaded pipe (NPT), to one of Premier Mount’s optional ceiling

adapters (see page 6), or to a single wood stud (see Page 8). If using an optional adapter, please refer to the installation

instructions that come with adapters.

1. After the pipe has been properly secured to the ceiling structure, thread the base box to the lower portion of the pipe.

2. Secure the base box to the pipe with the M6 x 8mm set screw and tighten it down using the M3 Allen wrench (supplied).

M3 Allen Wrench

PDS Base Box

Advertising