Premier Mounts Low-Profile Universal Projector Mount PDS-PLUS User Manual

Page 8

Advertising
background image

PDS-PLUS

Page - 8 -

Installation Instructions

Ceiling Installation – Solid Surface

1. Separate the Upper Bridge from the Base Box by removing the six (6) M6 x 12mm Phillips head screws (three on each side).

2. Use the appropriate slot openings for single wood stud mounting, depending on your ceiling configuration. The adjustable

channel slots on the upper bridge plate will allow you to fine tune the final orientation of the projector.

3. Secure the Upper Bridge to the center of the stud on the ceiling structure at this time using two (2) #14 x 2” wood screws

(supplied).

Upper Bridge

Base Box

Wood Ceiling Stud

Ceiling Surface

Upper Bridge

Mounting Slot

#14 x 2”Wood Screws

M6 x 8mm Set Screw

Advertising