Figure 22 – ParaBody 375101 User Manual

Page 17

Advertising
background image

17

0

1

2

3

4

5

6

1/2

1/2

1/2

1/2

1/2

1/2

FIGURE 22

STEP 22

• Route the ball end of the CABLE (32) around one 3-1/2” PULLEY (34) assembled to the FLOATING PULLEY BRACKET (11) using one

3/8 X 2” BOLT (64), two 3/8” WASHERS (51), and one 3/8” LOCK NUT (50) as shown in FIGURE 22.

32

64 3/8 X 2”

50

34

13

51

Advertising