Pentair 250K BTU/HR User Manual

Page 14

Advertising
background image

Risk of fire or asphyxiation if vent is not

assembled according to manufacturer’s instructions or if
vent parts from different manufacturers are mixed. Vent
parts from different manufacturers ARE NOT interchange-
able. Mixing parts from more than one manufacturer may
cause leaks or damage to vent. When installing a vent,
pick one manufacturer and be sure that all vent parts
come from that manufacturer and are specified by the
manufacturer for your system. Follow manufacturer’s
instructions and local and National Fuel Gas Code (U.S.)
or CSA B149.1, Natural Gas and Propane Installation
Codes (Canada) requirements carefully during assembly
and installation.
4. Install vent pipe so that it can expand and contract

freely as the temperature changes. Support the vent
pipe according to applicable codes and vent manufac-
turer’s instructions. Pipe support must allow the vent
pipe free movement out and back, from side to side,
or up and down as necessary, without putting a
strain on the heater or vent body. Slope horizontal

pipe runs up from the heater at least 1/4" per foot
(2cm/M). Install Listed condensate drains at low
points where condensate might collect. Plumb con-
densate drains to a drain through hard piping or
high-temperature tubing such as silicone rubber or
EPDM rubber – do not use vinyl or other low temper-
ature tubing. Follow drain manufacturer’s installation
instructions.

5. Use Listed firestop for floor and ceiling penetrations.

Use Listed thimble for wall penetrations. Use a Listed
roof flashing, roof jack, or roof thimble for all roof
penetrations. Do not fill the space around the vent
(that is, the clear air space in the thimble or
firestop) with insulation. The roof opening must be
located so that the vent is vertical.

6. Vent Termination – Vertical (See Figures 12A and

12B, page 13, for height of vent termination above
the roof. See Table 7, Page 15, for Listed termina-
tions.) Use a Listed vent terminal specified by local
and national codes and your manufacturer’s instruc-
tions. A roof termination must be vertical. In Canada,
the Vent Cap location shall have a minimum clear-
ance of 4 feet (1.2M) horizontally from electric
meters, gas meters, regulators, and relief openings.

7.

Vent Termination – Horizontal (See Table 7). Use a
listed wall thimble and vent terminal from Table 7.

The terminal must be located (U.S.-See Figure 13):
• at least 3" and at most 12" out from the wall (see

Figure 14), following the vent manufacturer’s instruc-
tions.

• at least 12" above finished grade or the normally

expected snow accumulation level, whichever is higher

• at least 4 feet below or horizontally from, or 1 foot

above, any doors or windows or gravity air inlet to a
building

• At least 3 feet above any forced air inlet located within

10 feet

• At least 4 feet horizontally from electric meters, gas

meters, regulators and relief equipment

• At least 7 feet above grade adjacent to walkways or

similar traffic areas.

WARNING

14

Brand

Manufacturer

Material Type

Sealant

Saf-T Vent

®

4”

Heat-Fab, Inc.

Metal

Consult Manufacturer

Special Gas Vent

38 Hayward Street

(Single Wall)

Greenfield, MA 01301
(800) 772-0739

Saf-T CI Vent

®

Heat-Fab, Inc.

Metal

Consult Manufacturer

Special Gas Vent

38 Hayward Street

(Double Wall)

Greenfield, MA 01301
(800) 772-0739

Z-Vent 4” Special

Z-Flex U.S., Inc.

Metal

G.E. RTV 106

Gas Vent (Type BH),

20 Commerce Park North

Model SVE

Bedrford, NH 03110-6911
(800) 654-5600

Table 5: Recommended Special Gas Vents (Positive Pressure)

Minimum Height

Roof Pitch

Above Roof*

Flat to 6/12

1 Ft.

6/12 to 7/12

1 Ft. 3 in.

>7/12 to 8/12

1 Ft. 6 in.

>8/12 to 9/12

2 Ft.

>9/12 to 10/12

2 Ft. 6 in.

>10/12 to 11/12

3 Ft. 4 in.

>11/12 to 12/12

4 Ft.

>12/12 to 14/12

5 Ft.

>14/12 to 16/12

6 Ft.

>16/12 to 18/12

7 Ft.

>18/12 to 20/12

7 Ft. 6 in.

>20/12 to 21/12

8 Ft.

* Vent must be at least eight (8) feet away from nearest vertical
surface. Vents extending five (5) feet or more above the roof must
be braced or guyed. Consult your local code officials for detailed
information.

Table 4: Vent Termination Height vs.

Roof Pitch – U.S.

Advertising
This manual is related to the following products: