Preparing for installation and removal – NEC Express 5800/230Eh User Manual

Page 210

Advertising
background image

9-4 Upgrading Your Server

PREPARING FOR INSTALLATION AND REMOVAL

Prepare the installation or removal of a component depending on the following procedure:

1.

Shut down the OS or press the POWER/SLEEP switch to turn off the power of the server.
(The POWER/SLEEP lamp goes off.)

2.

Pull out the power cord from the AC inlet on the server.

3.

Remove all the cables connected to the server on the rear panel.

Advertising