Installing the ac power supply – Nortel Networks NN46200-301 User Manual

Page 18

Advertising
background image

18

Power supply installation

—End—

Installing the AC power supply

Install the AC power supply to provide AC power for components.

Do not install the 8301AC power supply and the 8302AC power supply
within the same chassis. This configuration is not supported.

When you first install a 8000 Series chassis that requires two power
supplies, you must turn on both power supply units within 2 seconds of
each other. If you wait longer to turn on the second power supply, both
power supplies shut down. To correct this condition, turn off both power
supplies, wait at least 30 seconds, and then turn on both power supplies
again within 2 seconds.

DANGER

Due to high-energy hazards of working with components of greater
than 240 VA, only qualified service personnel are permitted to
install and replace Ethernet Routing Switch 8300 components.

To install an AC power supply:

Step

Action

1

Remove the filler panel from the power bay if necessary.

For instructions, see

"Removing and installing a power filler panel"

(page 17)

.

Nortel Ethernet Routing Switch 8300

Installation — AC Power Supply

NN46200-301

03.01

Standard

4.0

27 August 2007

Copyright © 2007, Nortel Networks

.

Advertising