Step 4 : shelves – Nuvo 500 User Manual

Page 8

Advertising
background image

~8~

~9~

STEP 4 : SHELVES

Open box VP4S or VP4D

Hook

SHELVES into hangers start-

ing from the bottom of cabinet, (12

shelves on cooling unit side, 14 on

the other) alternating the two sides

HINT :

CENTER SHELVES ON HANGERS

1

2

Snap

SHELVES into

hangers on one side

Push the

SHELVES

down to snap into op-

posite side hangers

3

3

1

2

PRESS

BOTTOM

TOP

1

2

Install

COUPLER SHELVES between

the

VERTICAL COUPLER and the

BACK PANEL, hook them on the

COUPLER HANGERS (G)

Install 4

HANGERS STRIPS, hook-

ing them to the

COUPLER SHELVES

through square holes. (Watch for

orientation, all hooks have to point

upwards).

NOTE : Assure that each of them is

hooked to all 4 shelves

1

2

COUPLER SHELVES

VERTICAL COUPLER

G

Advertising
This manual is related to the following products:

250