Data Network Terminal Single-port and Multiport Operating Instructions

52 (128)

© Nokia Corporation

DN01145897

Nokia Proprietary and Confidential

Issue 2-0 en

The following tests are available for testing a DNT2Mi terminal:

Table 14.

Tests available for DNT2Mi

Front

panel

Q1

management

Automatic

control

Note

Equipment tests

Power up test

After power is
switched on

Self test

Equipment
self test

Self test

(5,4)

Line interface test

Network test loop

ITU-T X.150 loop 2

Data coming from the line is
looped back to the line.

Line DL
test

Loop to line (DL)

See Figure “Network
test loop (all ports)”
after this table.

Dedicated port tests

Local test loop

ITU-T X.150 loop 3

Data coming from the DTE is
looped back to the DTE.

Port LL test

Loop to DTE (LL)

(5,2,#,3)

V.xx Circuit 141
or X.21 loop 3
command

Automatic control can
be disabled by setting
circuit 141 in the ‘Not in
use’ state.

See Figure “Local test
loop in a port” after this
table.

Network test loop

ITU-T X.150 loop 2

Data coming from the line is
looped back to the line.

Port DL
test

Loop to line (DL)

(5,2,#,2)

See Figure “Network
test loop (single-port)”
after this table.