Clearances – Raypak RAYTHERM 0133-4001 User Manual

Page 6

Advertising
background image

REDUCTION OF CLEARANCES TO PROTECTED
SURFACES

CLEARANCES

CLEARANCES FROM COMBUSTIBLE SURFACES

(All dimensions are in inches)

Note: The boiler shall be installed in a space large in
comparison to the size of the boiler. Large space is
defined as having a volume at least sixteen (16) times
the total volume of the boiler.

Note 1:
Combustible floor shield is required when boiler is to be
installed on a combustible surface. (See ordering infor-
mation on pg. 4.)

Note 2:
Servicing Clearances: Provide at least 24" (Models
133-1826), 48" (Models 2100-4001) in front of unit for
removal and servicing of the Controls & Burner Tray.
Provide at least 18" on side opposite water connections
for deliming of Heat Exchanger Tubes.

*Vent includes factory-supplied drafthood and does not
include field-supplied vent systems above the draft-
hood. On Models 2100-4001 drafthood is built into
boiler.

6

Derived from National Fuel Gas Code, Table 6.2.3(a)

Derived from National Fuel Gas Code, Table 6.2.3(b)

MODEL

133

181 to

401

514 to

824

926 to

1826

2100 to

4001

Advertising