Roberts Gorden Combat UHD[X][S][R] 75 User Manual
Page 44
UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
38
14.5 Flue Blower Vertical Installation
IT IS IMPORTANT THAT ONLY THE CORRECT FLUE BLOWER SPECIFIED FOR EACH MODEL TYPE
IS USED WHEN REPLACING THESE ITEMS.
Carry out a start-up after working on or changing a flue blower. See Page 26, Section 11.
MODEL
UHD[X][S][R] 75
UHD[X][S][R] 100
UHD[X][S][R] 125
Flue Blower P/N
90710404
90710405
90710405
Mounting Plate
to Vent Box
fixing screws
Flexible Air
Duct
Intake &
Exhaust
Covers
Air Intake Adapter
Gasket
Air Intake
Adaptor
Intake &
Exhaust
Covers
Mounting Plate
to Vent Box
fixing screws
Gaskets
Vent Box
Mounting Plate
to Flue Blower
screws
To remove the blower, remove
screws securing the fan and
mounting plate to the vent box.
To remove the blower from the
mounting plate, remove screws.
Refit in reverse order.
To change the vent and air
intake orientation from back to
top, remove the blower and
mounting plate as above.
Remove intake (if applicable)
and exhaust covers from top of
the heater.
Rotate the blower, mounting
plate and gasket clockwise until
the flue adapter lines up with
the top hole. Secure screws.
If applicable, remove the flexible
air duct from the air intake
adapter on the back.
If applicable, remove the air
intake adapter from the back of
the heater and install in the
appropriate hole on top.
Reconnect the flexible air duct.
Install intake and exhaust
covers over the back holes.
NOTE: Separated combustion model shown.