Mounting procedure, Surface mount control units – Raymarine autopilot + ST4000+ User Manual

Page 64

Advertising
background image

Chapter 5: Installing the ST4000+

49

5

In

stal
ling t

he

ST4
000+

Mounting procedure

Control units are available in surface mount and flush mount styles.

Surface mount control units

To fit a surface mount control unit:

1. Apply the surface mount template (supplied at the back of this

handbook) to the selected bulkhead.

2. Mark the centers of the two fixing holes and the cable boss.
3. Drill two 5 mm (

3

/

16

in) diameter holes for the fixing studs.

4. Use a 90 mm (3.55 in) diameter cutter to drill the hole for the

cable boss.

5. Peel the protective sheet from the self-adhesive gasket, then stick

the gasket into position on the rear of the control unit surround.

6. Screw the fixing studs into the control unit.
7. Pass the cables (power, compass, SeaTalk etc.) through the

bulkhead and connect them to the appropriate terminals (as
described later in this chapter).

8. Assemble the control unit to the bulkhead.
9. Secure the control unit with the thumb nuts provided.

Hand-tighten the thumb nuts – do NOT use a wrench.

D3243-3

Cable boss

Self-adhesive

gasket

Fixing stud

Thumb nut

Advertising