Burner setup – Quincy Compressor Air Compressor User Manual

Page 13

Advertising
background image

10

In all boilers, regardless of fuel being burnt or configuration, a 10” X 10” Cerafiber pad should be installed
under the flame. This pad is not for acoustic purposes, it is to keep the area under the nozzle warm to prevent
flame out.

Good, reliable operation with a minimum of service starts with attention to the small details:

1. Setting the nozzle position and electrodes "by the book" using the

manufacturer's gauges.

2. Installing a quality micron filter at the burner.

3. Making careful/tight flare connections without couplings on oil suction line.

4. Checking fuel pump pressure.

5. Checking draft at the breeching to insure it is adequate to overcome flue

gas resistance.

6. Setting the air band properly with well maintained instruments. A good

target is 11% to 12.5% of (CO

2

) or 6.5% to 3.8% of (O

2

).


To ensure proper burner setup, gauges should be used to check things such as the pump pressure, CO

2

levels,

etc...

3. Burner Setup

Advertising