Preparing for the installation, Providing necessary tools – Quantum Audio SuperLoader 3A Series User Manual

Page 2

Advertising
background image

2

Preparing for the Installation

SuperLoader™ 3A Series Quick Start Guide

Choose a location that meets the following criteria:

Preparing for the Installation

Before you begin the installation procedure in this section, make the following

preparations as described in this section:

Providing Necessary Tools

Taking ESD Precautions

Preparing for Rack Mounting

Providing Necessary Tools

0

Provide the following tools for unpacking and installing the autoloader:
• #2 Phillips screwdriver
• Level
• Antistatic wrist strap

Criteria

Description

Rack requirements

Standard 19-inch rack

Room temperature

10–35° C (50–95° F)

Power source

AC power voltage: 100–127 VAC; 200–240 VAC
Line frequency: 50–60 Hz
Locate the AC outlet near the autoloader. The AC power
cable is the product’s main disconnect device and must be
easily accessible at all times.

Weight

15.5 kg (34 lb.) unloaded
18.6 kg (41 lb.) loaded with 2 magazines, 16 cartridges

Air Quality

Minimize sources of particulate contamination. Avoid areas
near frequently used doors and walkways, cooling or exhaust
vents, stacks of supplies that collect dust, printers, and
smoke-filled rooms.
Excessive dust and debris can damage tapes and tape drives.

Humidity

20–80% RH (non-condensing)

Clearance

Back: Minimum of 43.2 cm (17 in.)
Front: Minimum of 68.6 cm (27 in.)
Sides: Minimum of 5.08 cm (2 in.)

Advertising