Suggested tool requirements, Features and installation – QUASAR HQ-2244UH User Manual

Page 11

Advertising
background image

11

Features

and

Installation

Foam-PE

Top retainer bar

Top retainer bar

Foam-PE

Screw

(Type A)

Screw(Type A)

Shipping screws

Lower guide

PREPARATION OF CHASSIS

1. Remove the screws which fasten the cabinet at

both sides and at the back.(See Fig. 1)

2. Slide the unit out from the cabinet by gripping the

base pan handle and pulling forward while
bracing the cabinet.(See Fig. 2)

3. Cut the window sash seal to the proper length.

Peel off the backing and attach the Foam-PE to the
underside of the window sash.(See Fig. 3)

4. Remove the backing from Foam-PE with 3 holes

and attach it to the bottom of the Top retainer
bar.(See Fig. 4)

5. Attach the Top retainer bar on the top of the

cabinet with 3 screws (Type A).(See Fig. 4)

6. Insert the Frame Curtain into the Top retainer bar

and Lower guides.(See Fig. 4)

7. Fasten the curtains to the unit with 10 screws

(Type A) at both sides.(See Fig. 4)

Suggested Tool Requirements

SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Advertising