Thermador VTN420B User Manual

Page 16

Advertising
background image

Page 16

REMOTE VENTILATOR
INSTALLATION Models
VTR600R or VTR1000Q (Only
HS and HST Series Hood):
The hood is designed to work with

Thermador’s remote ventilator (see

list under paragraph “Parts Not
Included with your Hood

”). For

installation instructions see the

instructions supplied with the

ventilator unit.

Wiring the Hood with a Remote
Ventilator:

Warning:

Turn off electricity at

the service panel before wiring the

unit.

1.

Remove the j-box cover as

shown in Figure 13.

2.

Remove cover T from the j-box.

3.

Remove the 2 knockouts and

install 1/2” conduit connectors.

4.

Run black, white, and green

wires (#14AWG) in 1/2” conduit

from power supply to j-box.

5.

Connect black, white, and

green wires from power supply

to black, white, and green/

yellow wires in j-box

respectively.

6.

Connect wire clamp to “pigtail”

as shown in Figure 12. Insert

“pigtail” wires into j-box and fix

wire clamp to j-box using nut

supplied with wire clamp V.

7.

Run five wires (#14 AWG) in 1/

2” conduit from the remote

blower to the second conduit

connector.

8.

Connect the black, white, red,

and blue wires from the remote

ventilator to the black, white,

red, and blue wires of the “pigtail

Figure 13

respectively. Connect the

remote blower green/yellow

(ground) wire to the ground wire

from the service panel.

9.

Close junction box cover. Check

that all light bulbs are secure

in their sockets. Install filters.

Turn power on at service panel,

and check lights and blower

operation per Care & Use

section of this manual.

Ground

Advertising