Mechanical installation 110sr – Tannoy SUBWOOFERS User Manual

Page 17

Advertising
background image

17

MECHANICAL INSTALLATION 110SR

3)

(Fig. 4) shows the PIR installed against a steel stud furring channel. Attach the PIR with screws directly through
the furring and into 24” strips of blocking installed on the upper side of the channel so that the screws will go
into both. Ensure that overhead work is carried out safely, and according to local building codes.

4)

After the PIR installation is complete, run your signal wires. At this time, have an electrician install electrical
circuits for your sub, if required.

5)

Also at this time, we recommend that you install a safety line, typically a light gauge wire rope, from a secure
point on the support structure above the subwoofer. Attach this to the strapping on either side of the sub and
suspend it in case the installation is compromised. Follow the instructions for wire rope installation from your
wire rope supplier, and check with your local building code for specifics.

Figure 1: Instalation of blocking for flush mounting
of PIR to joists.

Figure 2: Overhead view of PIR, showing blocking attached to joist.

Figure 3: Attaching PIR to blocking.

Figure 4: PIR installed on steel furring channel prior
to drywall being placed.

Advertising