Installing the monitor – Vizio WB-31 User Manual

Page 8

Advertising
background image

WB-31

Page 8

Installation Instructions

Figure 7. Cable Routing

Installing the Monitor

1. Loosely tighten two (2) M4 x 10mm Phillips Head screws to the top of the mounting points.

2. Insert the head of the screws through the keyhole slots and then secure the bottom two (2)

M4 x 10mm Phillips Head screws to secure the flat panel to the mounts, then tighten the upper

M4 x 10mm Phillips Head screws (Figure 6).

CAUTION: Do not over tighten the M4 x 10mm Phillips Head screws, or else damage to the

display may occur.

Cable Access

Please refer to Figure 7 for the correct way to route existing any cables.

WB-31 Articulating Swingout Arm - After the monitor has been mounted, remove the cable access plastic

Cable access

plastic covers

Display

(2) M4 x 10mm

Phillips screws

(2) M4 x 10

Phillips screws

Figure 6. Monitor Installation

Cable access

holes

Articulating Swingout Arm

Advertising