10. Pipe Connections

The Riva boiler is supplied with a 3/4” stainless steel gas pipe (A in figure 10.1), 2 - 3/4”
copper pipe (C,D in figure 10.1), located in a plastic bag in the boiler package.

A

B

C

D

E

Figure 10.1

A)

Stainless steel gas

pipe

B) Main circuit drain

cock

C) C.h. return copper

pipe

D) C.h. supply copper

pipe

E) C.h. PRV discharge

copper pipe

Installation:

• Remove the

protective caps off
boiler connections
(Figure 10.1).

• Thoroughly clean the

connections.

• Attach the supplied

components to the
boiler connections
(see Figures 10.1).
Be sure to

use the proper
gaskets for the pipe
connections.

• Before connecting the

boiler to the heating
system piping, review
the suggested piping
diagrams in Section 4
(page 12).

• If the c.h. system is

above the boiler level,
it is advisable to
install c.h. cocks
close to the boiler for
servicing operation

RIVA HEAT ONLY MANUAL - REV A