Installing to wall – Vanguard Managed Solutions VP1000B User Manual

Page 12

Advertising
background image

12

099406

Placing Heater On Mounting Screws

1. Locate two keyhole slots on back panel of heater (see Figure 9).
2. Place large openings of slots over screwheads. Slide heater down until screws

are in small portion of slots.

Figure 10 - Removing Front Panel Of Heater

Installing Bottom Mounting Screw

1. Locate bottom mounting hole. This hole is near bottom on back panel of heater

(see Figure 11).

2. Mark screw location on wall.
3. Remove heater from wall.
4. If installing bottom mounting screw into hollow or solid wall, install wall anchor.

Follow steps 1 through 5 under Attaching To Wall Anchor Method, page 11.
If installing bottom mounting screw into wall stud, drill hole at marked location
using 9/64" drill bit.

5. Replace heater on wall.
6. Insert bottom anchor screw through back panel into bottom anchor or drilled

hole (see Figure 11).

7. Tighten screw until heater is firmly secured to wall. Do not over tighten.

Note:

Do not replace front panel at this time. Replace front panel after making

gas connections and checking for leaks (see pages 13-15).

Keyhole Slots

INSTALLING

TO WALL

Continued

Figure 9 - Location Of Keyhole Slots On Back Panel Of Heater

Removing Front Panel Of Heater

1. Remove two screws near bottom corners of front panel.
2. Lift straight up on grill guard until it stops. Grill guard will slide up about 1/4".
3. Pull bottom of front panel forward, then down.

Figure 11 - Installing Bottom Mounting Screw

Advertising