Weider WEBE29911 User Manual

Page 12

Advertising
background image

25

12

22

18

96

96

35

58

76

22. Route the Bench Cable (58) under a 4 1/2” Pulley

(35). Attach the Pulley to the Front Leg (18) with
an M10 x 75mm Bolt (73), two 17mm Spacers
(96), two M10 Washers (79), and an M10 Nylon
Locknut (77).

23. Attach the Bench Cable (58) to the Back Leg (39)

with a Cable Clip (28).

24. Press a 19mm Round Inner Cap (48) into each

end of the three Pad Tubes (41).

Slide two Pad Tubes (41) through the holes in the
Leg Lever (19). Slide the third Pad Tube through
the holes in the Front Leg (18). Slide two Foam
Pads (42) onto each Pad Tube.

25. Locate the High Cable (61).

See the inset drawing. Slide a Cable Ball (56)
onto the end of the High Cable (61). Thread an
M6 Locknut (80) onto the Cable as far as it will
go. Tighten a Cable Eye (57) onto the Cable.
Hold the Cable Eye and fully tighten the Locknut
against the Cable Eye. Slide the Cable Ball over
the Locknut and the Cable Eye.

Route the end of the High Cable (61) without a
Cable Ball (56) through the tube on the left Pulley
Arm (7). Wrap the Cable around a 4 1/2” Pulley
(35) and attach the Pulley to the Pulley Arm with
an M10 x 45mm Bolt (76) and an M10 Nylon
Locknut (77). Note: Be sure the Cable is under
the indicated pin on the Pulley Arm.

73

77

79

79

7

Tube

Pin

35

61

56

77

58

42

42

42

48

48

19

18

41

28

39

23

24

61

56

80

57

Advertising