Weider WEBE29911 User Manual

Page 13

Advertising
background image

13

27

28

29

30

35

36

55

76

5

7

35

76

93

33

77

77

77

76

61

Tube

27. Wrap the High Cable (61) around a 4 1/2” Pulley

(35). Attach the Pulley and a Large Cable Trap
(55) to the “U”-Bracket (33) with an M10 x 45mm
Bolt (76) and an M10 Nylon Locknut (77).

28. Wrap the High Cable (61) around an 88mm

Pulley (36). Attach the Pulley and a Small Cable
Trap (93) to the Right Frame (5) with an M10 x
45mm Bolt (76) and an M10 Nylon Locknut (77).

29. Route the High Cable (61) through the tube on

the right Pulley Arm (7). Wrap the Cable around a
4 1/2” Pulley (35). Attach the Pulley to the Pulley
Arm with an M10 x 45mm Bolt (76) and an M10
Nylon Locknut (77).

See the inset drawing. Slide a Cable Ball (56)
onto the end of the High Cable (61). Thread an
M6 Locknut (80) onto the Cable as far as it will
go. Tighten a Cable Eye (57) onto the Cable.
Hold the Cable Eye and fully tighten the Locknut
against the Cable Eye. Slide the Cable Ball over
the Locknut and the Cable Eye.

30. Locate the Carriage Cable (60). Attach the end

of the Cable inside the Top Frame (9) with an
M10 x 75mm Bolt (73), two 27mm Spacers (94),
two M10 Washers (79), and an M10 Nylon
Locknut (77).

61

61

61

56

73

60

94

94

9

79

79

77

80

57

6

61

93

76

36

77

26. Wrap the High Cable (61) around an 88mm

Pulley (36). Attach the Pulley and a Small Cable
Trap (93) to the Left Frame (6) with an M10 x
45mm Bolt (76) and an M10 Nylon Locknut (77).

26

Advertising