Installation — assembly, Continued, Z-vent ii vent starter tee – Weil-McLain GV Series 3 User Manual

Page 7

Advertising
background image

Part number 550-110-266/0601

7

GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement

Installation — assembly

continued

Figure 8

Sidewall termination installation (non-direct venting)

Figure 9

Non-direct vent through sidewall

(using termination coupling) Follow Z-Vent II
manufacturer’s instructions for proper installation of
vent runs, including slope and support.

Figure 10

Non-direct vent through roof

Follow Z-Vent II manufacturer’s instructions for proper
installation of vent runs, including slope and support.

26604b

Z-Vent II

vent starter tee

26605b

Z-Vent II

vent starter tee

26609

¼" to ¾" between stop
on termination and
metal plate

4" galvanized sleeve
(through 4 " hole for

wall)

¹⁄₈

combustible

Spacers (2)

(to support and

center vent in

sleeve)

Spacers (2)

(to support and

center vent in

sleeve)

Termination coupling

Sealant

Sealant

Pipe section

Pipe section

Metal plate

Metal plate

Advertising
This manual is related to the following products: