Damper, Combustion air – White Rodgers G1N 4R9 User Manual

Page 8

Advertising
background image



For a proper installation, follow the advices below:


1. All the joints of the evacuation pipe must be secured, using three screws.

Make sure that each screw goes through the inner walls of both connectors (male and female). See
pictures below showing a male-female coupling.


PROPER INSTALLATION

UNPROPER INSTALLATION


8


2. A minimum rise of 1/4 inch per horizontal foot must be respected.


DAMPER


The barometric control must be adjusted so that the maximum draft measured at the furnace outlet is limited to -0.06
in. w.c. Please note that a draft higher than -0.06 in. H2O could result in an uncontrollable fire. On the other hand,
the minimum draft to be respected is -0.04 in. w.c. in the evacuation pipe on the solid fuel side, no matter what
type of furnace.

COMBUSTION AIR


In the event that the furnace and the chimney are completely cold, it might be necessary before lighting, to provide
fresh air by opening a door or a window for a few minutes.

Take note that a house constructed or renovated in order to be airtight is liable to lack fresh air which is necessary
for a proper combustion and a proper operation of heating units.

In such a case, when starting up the fire, do not operate appliances which evacuate air outside the house such as:

- Range

hood


- Air

exchanger

- Cloths

dryer

- Bathroom

fan

-

Ventilated central vacuum system

CAUSE RESTRICTION

Advertising