Mower deck installation (pto shaft connection), Installing pto quick coupler, Coupler ring "locked" position – Walker MW 15 HP User Manual

Page 21: Assembly instructions

Advertising
background image

Assembly Instructions

17

Mower Deck Installation

(PTO Shaft Connection)

Installing PTO Quick Coupler

Coupler Ring “Locked” Position

5.

Pull out counterweight spring receptacle assist
handle and lift up on locking finger slightly to
unlock the receptacle assembly. Lower this
assembly toward the deck and attach the coun-
terweight springs to the receptacle. Raise the
assist handle until the assembly locks into the
raised position to tension the springs

Counterweight Spring Receptacle Assembly in

"Unlocked" Position

Counterweight Spring Receptacle Assembly in

"Locked" Position

6. With the counterweight springs connected, the

weight on the deck caster wheels should be
15 to 25 Ib (7 to 11 kg). Check this weight by lift-
ing on the front of the deck carrier frame. If
required, the spring tension can be adjusted by
tightening or loosening the elastic stop nuts
located underneath the lower spring hook.

Grease Deck

Support Arms

PTO

Shaft

Pull Back Spring-Loaded

Coupler Ring

Spring-Loaded Coupler Ring

In Fully Forward Position

3) Use Lever to Assist

Raising Assembly to

"Locked" Position

2) Retain Spring Clip

Using Tab

1) Install Counterweight

Spring Clip

into Receptacle

Locking Finger "Snaps"

to Hold Assembly in

"Locked" Position

Lift Up on Locking

Finger to Lower

Assembly

Advertising