Cable assembly – Weider WESY2916.0 User Manual

Page 15

Advertising
background image

15

18.

See the CABLE DIAGRAMS on page 28 to identi-
fy the cables as you assemble them.

Identify the Butterfly Cable (50). Grease an
M8 x 22mm Shoulder Bolt (90). Attach the Cable to
the Left Butterfly Bracket (28) with the Shoulder Bolt
and an M8 Nylon Locknut (78).

Make sure the flat

edge of the Cable is against the Butterfly Arm.
Do not overtighten the Shoulder Bolt; the Cable
must be able to pivot freely.

19. Wrap the Butterfly Cable (50) over a “V”-pulley

(47). Attach the “V”-pulley, a Long Cable Trap
(57), an M10 Washer (80), and two Guards (54)
to the Upright (2) with an M10 x 60mm Bolt (79)
and an M10 Nylon Locknut (77).

20. Wrap the Butterfly Cable (50) under a 90mm

Pulley (48). Attach the Pulley and two Half
Guards (55) to the Double “U”-bracket (61) with
an M10 x 45mm Bolt (86) and an M10 Nylon
Locknut (77).

Make sure the Half Guards are

oriented as shown.

18

19

54 50

47

2

80

54

57

79

77

50

78

90

Grease

28

20

48

50

77

55

55

61

86

Cable Assembly

Flat Edge

Advertising