Weider WESY2916.0 User Manual

Page 21

Advertising
background image

21

36. Wrap the Leg Lever Cable (51) under a 90mm

Pulley (48). Attach the Pulley to the Right Press
Arm (16) with an M10 x 50mm Bolt (97), two Half
Guards (55), a Cable Trap (56), an M10 Washer
(80), and an M10 Nylon Locknut (77).

Make sure

the Cable Trap and Half Guards are oriented
as shown.

37. Wrap the Leg Lever Cable (51) around a “V”-pul-

ley (47). Attach the Pulley to the Upright (2) with
an M10 x 70mm Bolt (113), two Half Guards (55),
an M10 Washer (80), a Long Cable Trap (57),
and an M10 Nylon Locknut (77).

Make sure the

Cable Trap and Half Guards are oriented as
shown.

38. Wrap the Leg Lever Cable (51) around a 90mm

Pulley (48). Attach the Pulley to the Left Press
Arm (15) with an M10 x 50mm Bolt (97), two Half
Guards (55), an M10 Washer (80), and a Cable
Trap (56).

Make sure the Cable Trap and Half

Guards are oriented as shown.

36

37

47

80

55

77

2

55

51

113

57

97

55

56

48

77

80

55

16

51

38

55

56

55 77

15

48

51

80

97

Advertising