Weider WESY5993.3 User Manual

Page 11

Advertising
background image

11

22

80

Rod

28

71

76

11

20. Attach a Pulley Housing (94) to the indicated “U”-

channel on the 10-pound Center Resistance Bar
(44) with an M10 x 102mm Bolt (24), two Pivot
Bushings (74), and an M10 Nylon Locknut (76).

Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Pulley
Housing (94) with an M10 x 42mm Button Head
Bolt (71) and an M10 Nylon Locknut (76).

21. Wrap the Long Cable (80) around a 90mm Pulley

(28). Attach the Pulley and a Pulley Guard (29) to
the indicated M10 x 140mm Carriage Bolt (73)
with an M10 Nylon Locknut (76).

Make sure the

flat edge of the Pulley Guard is on the side
shown.

19. Wrap the Long Cable (80) under a 90mm Pulley

(28) as shown. Attach the Pulley and a Pulley
Guard (29) to the Upright (3) with an M10 x
113mm Button Head Bolt (40) and an M10 Nylon
Locknut (76).

Make sure the flat edge of the

Pulley Guard is on the bottom.

19

20

21

80

29

40

28

3

76

28

74

94

74

76

76

80

71

28

80

Flat

Edge

29

76

73

24

44

Flat

Edge

22

107

22. Make sure there are no Resistance Bar (not

shown) under the “U”-channels on the 10-pound
Center Resistance Bar (not shown). Have a sec-
ond person pull on the Long Cable (80) to create
slack in the Cable.

Insert the end of the Long Cable (80) through the
welded tube on the indicated end of the Cross
Tube (11) and then through the remaining Swivel
Arm (22).

Make sure the Cable is on the indicat-

ed side of the welded rod in the Swivel Arm.

Insert the Swivel Arm (22) into the welded tube
on the Cross Tube (11). Secure the Swivel Arm
with an M4 x 5mm Screw (107).

Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Swivel Arm
(22) with an M10 x 42mm Button Head Bolt (71)
and an M10 Nylon Locknut (76).

Advertising