Wegener Communications 6420 User Manual

Page 98

Advertising
background image

iPump 6420 User’s Manual

www.wegener.com

800070-01 Rev B

Chapter 3, Page 94

normally. What this means in practice is that operations will be moved up in time until the next
“hard time marker”, at which time the unit should return to normal operations.

To monitor a Microcasting session, the local web interface features an (Automation) sub-tab

under Status for each Decoder. When Microcasting is enabled for that screen’s Decoder, the
screen will feature a list of all the current day’s operations, past and future (if desired), with a
marker showing the current position in the list. See Figure 3-19 for an example. In addition to
the web status screen, the operator should observe that the front-panel’s PLAYBACK LED is lit
during Microcasting operation.

Note that all operations in Microcasting are logged, just the same as “normal” operations.

For each file or playlist play, there will be a pair of As-run Log entries. For the starting and
stopping of Microcasting, as well as every relay closure, there will be an Ops Log entry.

Microcasting authorizing keyfiles are named serialnumber-automation.pem.
The relevant indicators are:

1. PLAYBACK LED on while Microcasting is running with a valid sequence file

The relevant new user controls are:

1. Command to start Microcasting on a Decoder
2. Any permanent Audio Decoder command to go to some other perm setting
3. Use the terminal command ‘cert report’ to check for “Automation” authorization

Advertising