Install boiler — non-packaged boilers only, Boiler manual – Weil-McLain 550-141-826/1201 User Manual

Page 13

Advertising
background image

SERVICE TECHNICIAN ONLY — read and follow completely.

Install boiler — non-packaged boilers only

(continued)

Non-Packaged WGO-7, 8 & 9 — install flue

collector hood

(see Figure 4)

Obtain gas-tight seal to prevent possible flue gas

leakage and carbon monoxide emissions, leading
to severe personal injury or death.

1. Thread tinnerman clip on screw so that clip fits snugly in

notch of hold-down lug. Screw must not turn.

2. Remove paper on sealing rope. Starting at back section near

flue collar, position sealing rope around top of block with
adhesive side to sections. Do not stretch rope. Make sure rope
ends meet. Trim excess rope.

3. Position flue collector hood on top of boiler sections and

over screws and clips as shown in Figure 4.

4. Install washers and nuts. Tighten nuts until collector hood

makes contact with tinnerman clip.

5. Flue Cap

• Back flue outlet boiler — Position flue cap and strap over

opening in flue collector hood. Make sure rope in cap is

in place and in good condition. Tighten strap to hood

with screws provided.

• Top flue outlet boiler — Position flue cap and strap over

opening in back section. Make sure rope in cap is in place

and in good condition. Tighten strap to boiler with screws

provided in section. Install remaining screws in holes in

flue collector hood.

6. Check level. Shim legs, if needed.

Figure 4

Change from back flue outlet to top flue outlet (optional)

Sealing

rope in

groove

inside cap

Flue

cap

Flue cap

strap

Flue

collector

hood

Sealing

rope with

adhesive

tape

Nut

Washer

Tinnerman

clip

Screw

Hold-down

lug

Separate

block here

for easier

handling

Part number 550-141-826/1211

13

GOLD

WGO

OIL-FIRED NATURAL DRAFT WATER BOILER — SERIES 3 —

Boiler Manual

Advertising