Weider WESY5993.2 User Manual

Page 10

Advertising
background image

10

18. Attach a Pulley Housing (94) to the indicated “U”-

channel on the 10-pound Center Resistance Bar

(44) with a 3/8” x 4” Button Bolt (24), two Pivot

Bushings (74), and a 3/8” Nylon Locknut (76).

Wrap the Long Cable (80) around a 90mm Pulley

(28). Attach the Pulley inside of the Pulley

Housing (94) with a 3/8” x 1 1/2” Button Bolt (71)

and a 3/8” Nylon Locknut (76).

18

24

94

28

80

44

76

76

71

74

74

17. Wrap the Long Cable (80) around a 90mm Pulley

(28). Attach the Pulley and a Pulley Guard (29) to

the indicated 3/8” x 5 1/2” Carriage Bolt (73) with

a 3/8” Nylon Locknut (76). Make sure the flat

edge of the Pulley Guard is on the side shown.

17

76

28

80

73

29

Flat

Edge

16. Locate the Long Cable (80). Insert one end of

the Cable through the welded tube on the indicat-

ed end of the Cross Tube (11) and then through a

Swivel Arm (22). If necessary, use the tip of a

screwdriver to pull the end of the Cable out of the

Swivel Arm. Make sure the Cable is on the indi-

cated side of the welded rod in the Swivel Arm.

Insert the Swivel Arm (22) into the welded tube

on the Cross Tube (11). Secure the Swivel Arm

with a #8 x 3/8” Screw (107).

Wrap the Long Cable (80) around a 90mm Pulley

(28). Attach the Pulley inside of the Swivel Arm

(22) with a 3/8” x 1 1/2” Button Bolt (71) and a

3/8” Nylon Locknut (76).

16

71

22

107

28

80

11

76

Rod

“U”-Channel

15. Slide the Leg Developer (19) into the Bench Rail

(5). Align the hole in the Leg Developer with a

hole in the Front Leg (6). Tighten the Bench Knob

(42) into the hole in the Leg Developer.

Connect the eyebolt on the Leg Lever Cable (32)

to the indicated side of the Leg Lever (7) with a

5/16” Nylon Locknut (65).

42

6

19

5

65

Eyebolt

7

32

15

Advertising