25.

Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in

ADJUSTMENTS, beginning on page 15.

Before using the resistance system, pull the long cable a few times to be sure that it moves smoothly over

the pulleys. If the cable does not move smoothly, find and correct the problem. IMPORTANT: If the cables

are not properly installed, they may be damaged when heavy resistance is used. See the CABLE

DIAGRAM on page 18 for proper cable routing.

22

62

23

16

73

71

73

92

35

31

35

22. Attach a Small Pulley (16) inside of the hole in

the Front Leg (31) with an M10 x 91mm Bolt (92),

two 26mm Spacers (35), two M10 Washers (73),

and an M10 Nylon Locknut (71). Make sure the

Pulley is above the Leg Lever Cable (62).

Slide the two free ends of the Leg Lever Cable

(62) onto the hook welded to the bottom of the

Bench Rail (23).

23. Slide two Foam Pads (28) onto the tube on the

Front Leg (31). Press two 19mm Round Inner

Caps (33) into the ends of the tube.

Repeat this step with the Leg Lever (32).

24. Adjust the tension on the upper cable (not shown)

as described in UPPER CABLE ADJUSTMENT

on the following page.

23

28

33

32

31

28

33

21. Locate the Leg Lever Cable (62), which has two

ends that are the same length and a third end

that is longer.

Route the longest end of the Leg Lever Cable

(62) through the hole in the Front Leg (31), and

attach it inside of the slot in the Leg Lever (32)

with an M10 x 58mm Bolt (94) and an M10 Nylon

Locknut (71).