Upper cable adjustment – Weider WESY68633 User Manual

Page 14

Advertising
background image

14

After completing the assembly of the resistance system, the tension on the upper cable (B) will need to be

adjusted. Also, the upper cable can stretch slightly when it is first used. When this occurs, the upper cable ten-

sion will need to be readjusted. Follow the steps below to adjust the upper cable tension.

1. Connect the two Tension Gauges (109, 110)

together using the magnet.

2. Plug in the resistance system as described in

PLUGGING IN THE RESISTANCE SYSTEM on

page 17. Use the Console (not shown) to adjust

the resistance setting of the system to the highest

setting, as described in ADJUSTING THE RESIS-

TANCE on page 16.

Squeeze the upper cable (B) together near a

Large Pulley (17). Hook the ends of the Tension

Gauges (109, 110) around the upper cable as

shown. Do not hook the ends of the Tension

Gauges around the Tether (61); which is

attached to the back of the Pulley Bracket

(10).

Slide the Tension Gauges (109, 110) next to the

Large Pulley (17) as shown in the inset drawing.

3. Locate the 3/8” x 38mm Tension Screw (108) on

each end of the Resistance Bar (9). Alternately

tighten each Screw one turn at a time until the

two Tension Gauges (109, 110) are pulled apart

by the upper cable (B).

The upper cable tension is now properly adjusted.

1

2

3

17

B

B

B

110

110

109

109

109

110

B

108

9

10

61

17

Magnet

109

110

UPPER CABLE ADJUSTMENT

Advertising