Interconnection standards compliance, Intended use, De-energize/isolation procedure – Xantrex Technology GT Series User Manual

Page 12: Warning

Advertising
background image

Safety

x

153553

This guide for use by qualified personnel only

De-Energize/Isolation Procedure

The following procedure should be followed to de-energize the Inverter for
maintenance.

To isolate the Inverter:
1. Turn the main

ON

/

OFF

switch (S3) to the

OFF

position.

2. Open the utility connection circuit breaker.
3. Open the AC Disconnect.
4. Open the DC Disconnect Switch.
5. Install lockout devices on the utility connection circuit breaker, AC and

DC disconnect switch.

Interconnection Standards Compliance

The Ethernet Communications Kit complies with IEEE C37.90.1
requirements.
The Inverter complies with FCC Part 15 Class A requirements.
The Inverter is designed to meet NEC Article 690 and UL1741-2005 Static
Inverters And Charge Controllers For Use In Photovoltaic Power Systems
,
which includes testing for IEEE 1547.1-2005, IEEE 929-2000 and IEEE
519-2000.

Intended Use

The Ethernet Communications Kit may only be used in GT Series Three
Phase Grid Tie Inverters. It is not suitable for any other application areas.

WARNING

The terminals of the DC input may be energized if the PV arrays are energized. In
addition, allow five minutes for all capacitors within the main Enclosure to
discharge after disconnecting the Inverter from AC and DC sources.

Ethernet.book Page x Thursday, May 29, 2008 4:20 PM

Advertising