Inst allation – Zephyr EBO-E36ASX User Manual

Page 10

Advertising
background image

10

Inst

allation

1. If possible, disconnect and move freestanding or

slide-in range from cabinet opening to provide easier

access to rear wall. Otherwise put a thick, protective

covering over countertop, cooktop or range to

protect from damage or dirt. Select a flat surface for

assembling the unit. Cover that surface with a

protective covering and place all canopy hood parts

and hardware in it.

2. Determine and mark the centerline on the wall where

the canopy hood will be installed.

3. Select a mounting height comfortable for the user

and mark on wall behind cooktop.

4. Tape template, matching center-line and hood

bottom as shown in Figure below.

5. Place the lower support bracket on the template

making it coincide with the traced triangle, mark

center of two fastener location and one lower

fastener location then remove template.

CL

centerline

mounting

height

reference

fasteners

locations

lower

support

bracket

6. Mark wall with horizontal line 1" above highest and

1" below lowest fastener location.

7. Find studs behind drywall by tapping wall or using a

stud finder. Mark the center of the studs with a

vertical line to the right and left of the marked

fastener location.

8. Note: all fastener location must span the studs

otherwise proceed as follows:

Cutout drywall along marked lines. Install each

necessary between studs firmly flush with already

existing stud front. Make sure all mounting screws

will anchor to added studs. Replace drywall and

refinish.

9. Determine and make all necessary cuts in the wall

for the vent system. Install the vent system before

the canopy hood. See „Venting methods“ and

„Dimensions and clearance“ paragraphs.

Note - for Ductless - recirculating - installations:

Vent system is not required.

10. Determine the required height for the conduit and cut

a 1-1/4" (3.2 cm) hole at this location.

Run wires through hole according the National

Electrical Code or CSA Standards and local codes

and ordinances.

Note: If a In-line blower installation is required/

needed, then provide an additional hole/conduit.

There must be enough power supply cable from the

fused disconnect (or circuit breaker) box to make the

connection in the hood’s Junction box/es.

Use caulking to seal all openings.

Do Not turn on power until installation is completed.

11.Remark center line and hood bottom on same

location as before and tape template on wall as in

step 4 above.

12.Mount the lower support bracket with wood screws

(supplied in mounting hardware kit) on locations

marked on template, then remove template.

13.Install duct cover support bracket to wall flush to

ceiling with drywall anchors supplied (the duct cover

support bracket should be installed about 1/8“ (3mm)

away from the ceiling).

For Ductless (recirculating) installations

Install the deflector (available as an extra kit) under

the duct cover support bracket.

14. Note: disregard this step if intending to install a in-

line blower.

Purchase and install the Internal blower (see

paragraph „Before installing the hood - Parts not

supplied“ for model reference).