B. canada, C. other countries – ACR&Artex C406-2 HM User Manual

Page 37

Advertising
background image

25-62-11

Page 37 of 87

JUN 20/13

ACR ELECTRONICS, INC / ARTEX PRODUCTS

DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL

C406-2 (453-5000), C406-2HM (453-5001)

SUBTASK 25-62-11-990-002

B. Canada

(1)

CAR Part VI, Standard 625, Appendix C, requires the ELT to be inspected at intervals not

exceeding 12 months.

(2)

All maintenance and testing shall be performed in accordance with the requirements of CAR

Part V, Standard 571, Appendix G, which requires:

(a)

Corrosion inspection;

(b)

Operational testing;

(c)

Performance testing, including:

1

Measured peak power after 3 minutes of operation,

2

Measured frequency after 3 minutes of operation,

3

Audio modulation, which shall be recognizable as a typical ELT signal,

4

Measured current draw in the “OFF” (ARM) and in the “ON” position, as specified

by the manufacturer, and

5

The automatic activation system.

SUBTASK 25-62-11-990-003

C. Other Countries

(1)

For all other countries, maintenance and testing shall be conducted in accordance with the

requirements of applicable national regulatory authorities and the requirements herein, as

applicable. Local regulations and requirements shall take precedence.

Advertising