Installation – American Magnetics 4Q06125PS-430 High Stability Integrated Power Supply System User Manual

Page 33

Advertising
background image

Rev. 3

15

Installation

High-Current Four-Quadrant Supply

Refer to Figure 2-1 on page 14. Ensure the cabling is connected in the

following manner:

Note

The use of locking hardware is recommended for all high-current

connections.

Caution

Do not overtighten the hardware on the interconnections (refer to

specifications table on page 8 for torque limits). Overtightening can

result in damage to the terminals.

Note

The current-direction arrow on the CT must point toward the power

supply end of the cable.

a. Connect appropriate load cable to the power supply

COMMON

terminal (6) and route it through the zero flux current transducer

(see note). Connect the other end to the negative magnet current

lead (3).

b. Connect the positive magnet current lead (2) to the power supply

OUTPUT

terminal (1).

c. Connect the CT power supply to the

TRANSDUCER POWER

connector (5) on the rear of the Model 430 Programmer.

d. Connect the current transducer output to the current transducer

SIGNAL

connector (4) on the rear of the Model 430 Programmer.

e. Connect the DB15 cable from the

PROGRAM OUT

connector (14) on

the back of the Model 430 Programmer to the

ANALOG I/O

connector (7) on the rear of the power supply.

f. Install an instrumentation cable between the magnet support

stand top plate connector (8) and one of the

MAGNET STATION

connectors (11) on the rear of the Model 430 Programmer.

g. Optional: Install an instrumentation cable between one of the

LHe /

TEMP

connectors (10) on the rear of the Model 430 Programmer

and the Model 13x Liquid Helium Level Instrument and/or

temperature instrument (9). Refer to section A.6.2 on page 151.

h. Optional: Install an instrumentation cable between the

QUENCH

I/O

connector (13) on the rear of the Model 430 Programmer and

Advertising