Loading instructions – Blue Ox SC2001 User Manual

Page 8

Advertising
background image

© 2005

Blue Ox Division, Automatic Equipment Mfg. Co. • One Mill Road, Industrial Park

Pender, Nebraska 68047 • Phone 402-385-3051 • Fax 402-385-3360 • www.blueox.us
292-2676 4/05 Page 7 of 9

8. With ramp in place, roll the bike up the ramp and onto the carrier. Secure the bike with four tie downs using

the tie down brackets. Use two tie-downs to secure the handlebars to the two front tie down brackets (shown
in drawing above), compressing the suspension sufficiently so that the bike is secured tightly. Secure the
rear tire using a tie down on the back tie down brackets. Run a tie-down from one foot peg under the
deck to the other foot peg, then cinch down as tight as possible.

NOTE:

After loading, the bike

should be about vertical to the ground, not tilted to either side. Secure the loose ends of
the tie-downs straps. Do not let them hang free.

7. To prepare your motorcycle

carrier for loading, insert the
tie down brackets (item 7) into
supports just under deck, both
sides.

LOADING INSTRUCTIONS

TIE DOWN

TIE DOWN

7

SUPPORTS

TIE DOWN

Advertising