Reception and storage, Figure 3, Schematic diagram of the heat exchanger function – M&C TechGroup ECM-ExII Operator's manual User Manual

Page 12

Advertising
background image

12

Gas sampling and gas conditioning technology

3-3.0EX-ME

+5°C

Sample

OUT

Sample

IN

Condensate OUT

Cooling

block

Figure 3

S

chematic diagram of the heat exchanger function



13

RECEPTION AND STORAGE

The ECM-ExII gas cooler is a complete pre-installed unit.

Carefully inspect the ECM-ExII and any special accessories included with it immediately on

arrival by removing them from the packing and checking for missing articles against the
packing list!

Check the items for any damage in transit and, if required, inform the shipping insurance
company immediately of the damage found!

N O T E !


The cooler must be stored in a weather protected frost-free area!
During transport and when in storage, the cooler must always be stood up
with the transport feet positioned underneath so that the oil in the closed
compressor circuit cannot run out of this compressor case.
If the cooler is transported on its back by mistake, it must stood in the
operating position for approx. 24 hours before it is switched on!










Advertising