Reception and storage, Figure 3, Schematic diagram of the heat exchanger function – M&C TechGroup ECM-ExII Operator's manual User Manual
Page 12

12
Gas sampling and gas conditioning technology
3-3.0EX-ME
+5°C
Sample
OUT
Sample
IN
Condensate OUT
Cooling
block
Figure 3
S
chematic diagram of the heat exchanger function
13
RECEPTION AND STORAGE
The ECM-ExII gas cooler is a complete pre-installed unit.
Carefully inspect the ECM-ExII and any special accessories included with it immediately on
arrival by removing them from the packing and checking for missing articles against the
packing list!
Check the items for any damage in transit and, if required, inform the shipping insurance
company immediately of the damage found!
N O T E !
The cooler must be stored in a weather protected frost-free area!
During transport and when in storage, the cooler must always be stood up
with the transport feet positioned underneath so that the oil in the closed
compressor circuit cannot run out of this compressor case.
If the cooler is transported on its back by mistake, it must stood in the
operating position for approx. 24 hours before it is switched on!