Vutec VT22X VU-PRO - Installation Instructions User Manual

Page 9

Advertising
background image

7


6. Carefully, by trial and error, adjust the four hex bolts downwards, such that the they bring the

ceiling closure panel into final location just as the lift stops it’s upward travel.


7. Tighten the hex nuts that secure the adjustment of the four hex bolts.

8. Tighten the hex nuts clamping the sliding brackets to the 3/8 dia. threaded rods.

9. Install the projector to the unit, and make any further adjustments that may be required.

PROJECTOR ALIGNMENT:

Basic alignment of the projector to the screen is with the adjustments available through the
projector mount bracket.

Final alignment may be fine tuned through use of the four down travel stops located at the
bottom of the VU-PRO projector lift. The stop consists of a thumb screws (see Figure 5), and a
hex nut. By raising and lowering these screws in combination, the traveling platform and
projector may be tilted several degrees in any direction necessary.

When adjustments are completed, be sure to securely tighten the hex nut on each thumb screw.

FIGURE 7a

FIGURE 7b

Shown partially closed

Shown fully closed

Advertising