General Information:

1- The control panel must be installed or positioned in the way that the operator has

a constant visual of the lift during its travel while installation, setting limit switches
and regular use.

2- The projector lift and other equipment may only be installed when the installer is

working on a rigid and stable platform.

3- It is allowed to mount (1) piece of equipment, keeping the allowed maximum load

of 25 lbs.

4- When more equipment needs to be installed, the equipment must be assembled

in a way that they are mounted together as (1) piece underneath the lift, keeping
the allowed maximum load.

5- When loads are mounted underneath the lift it is important that the point of

gravity of the load is centered underneath the lift.

6- When the lift is faulty during normal use or during testing, it must be taken out of

service immediately. Repairs must be done by a approved technician.


Following are the primary steps involved in the planning and completion of a standard
installation.

 

 

 

 

 

 

 

 