VEGA VEGAPULS 66 (≥ 2.0.0 - ≥ 4.0.0) Modbus and Levelmaster protocol User Manual

Page 19

Advertising
background image

19

4 Mounting

VEGAPULS 66 • Modbus and Levelmaster protocol

41366-EN-121011

0%

100%

4

5

5

6

7

8

10

1

2
3

8

Fig. 15: Configuration surge pipe
1 Radar sensor

2 Marking of the polarisation direction

3 Thread or flange on the instrument

4 Vent hole

5 Holes

6 Weld joint

7 Welding neck flange

8 Ball valve with complete opening

9 Fastening of the surge pipe

Instructions for orientation:

•

Note marking of the polarisation plane on the sensor

•

With threaded fitting, the marking is on the hexagon, with flange

connection between the two flange holes

•

All holes in the surge pipe must be in one plane with this marking

Instructions for the measurement:

•

The 100 % point must be below the upper vent hole and the

antenna edge

•

The 0 % point is the end of the surge pipe

Advertising